Modelling the E&N in HO Scale in my basement

Archive for November, 2012

November 13, 2012

Made a lot of sawdust tonight on just five jigsaw cuts. Admittedly most of those cuts were in excess of four feet long each. And this is what I made:

Dominion Tar and Chemical

No, it’s not a wooden saguaro cactus silhouette (like the ones used in the night time scenes of Silver Streak) but rather the trackboard for Dominion Tar & Chemical. The spur on the right is where poles were loaded into three and five car sets for shipment all over the continent to be used for power poles.

It’s not much, but it’s still progress.


November 10, 2012

With my wife out of town on a two week holiday to Hawaii for scrapbooking, I finally took some time to get to work on the layout. Of course, also good that Dan and Cam were willing to help.

Some time ago, I acquired a couple display cabinets from another model railroader who was moving and downsizing. After sitting in the basement since spring, I finally have them installed on one of the unclaimed walls.

Display Cabinets are installed!

And then we got some work done on the trackboard into Dominion Tar & Chemical, drawing out where the main and the spur are going to go. Room for a 3 car spot plus a little more. BC Pole was also factored in and then since I could do some of that stuff on my own at a later time, figured on getting more of the benchwork done which does require a few more hands. And with that, we installed benchwork around the “nose” of the basement (south end) for the lower deck, and we now have the basic shape for Courtenay. We also found better spots for ICG in Courtenay, along with the team track across Cumberland Street from the station.

looking south into Courtenay

looking north towards Courtenay

We ran out of usable 2″ wide plywood, so we’re not quite done with Courtenay’s benchwork, plus I’m needing to install a narrow shelf into the stairway for the escape track out the extreme north end of Courtenay’s diminutive yard. Next weekend, I should be able to acquire more plywood in the correct dimensions and carry on with the task!

Of note, it would appear Layout Tours for the CMRS have been moved up into March… If I’m going to have the Victoria Sub portion of the layout operational by then, I should get a move on!