Modelling the E&N in HO Scale in my basement

June 25, 2011

I have two projects on the go right now in my basement.  One of which is installing tortoises into the “centre crossover” section of Lindsay Yard for the Calgary Free-mo.  The other project is the E&N, of course.

Dan called this morning and wanted to come over to do some work on the layout.  When he got here, he found out about the first project and wanted to get some practice with wiring up tortoises.  He’s likely installing a fair number of them on his layout when that gets going, and I didn’t see any reason why he couldn’t get some practice in now.  So, with some advice, guidance and my tools, he got to work on those and voila.  8 tortoises ready for installation.

Cam came over a little after Dan started in on the tortoises and he and I got to work on the layout.  Cam put in the last bits of cork on the Port Sub section on the middle deck, and then proceeded to grind the living daylights out of it to provide a level ramp off/on the cork for the transition from scenicked area to helix trackage which doesn’t have any cork.  My Surform tool got quite a workout.

Following that, he got some trackage laid from the peninsula helix towards Parksville’s industrial area, only to find there were two concerns:

1)  I didn’t have any micro-engineering joiners of suitable size.  Apparently the code 83/100 Atlas rail joiners are just a little oversize for the code 70 track.

2)  I didn’t have the curved #8 turnout for the Parksville team track built yet.  At some point soon, I’ll tackle that project.

I did receive a full box of goodies from Fast Tracks via UPS earlier in the week and in it were 24 #6 quicksticks which I started making use of.  Three turnouts are now virtually complete and ready for insertion into the layout after I spent the morning washing the turnout skeletons.

I also had a bit of a brainwave this morning and after explaining it to Cam and Dan, they readily agreed on the track revision. Northbound out of Wellington Siding, the trackage passes by ICG Propane and then curves again and into Bryn.  Noting the mainline distance between Wellington and Bryn being well over 7-10 miles, I figured there should be a little bit more track between the two and used the space underneath the unloading ramp north of Parksville Junction to install a little more hidden trackage to increase the running length and improve the illusion of distance between the two places.  Once Dan finished with the Tortoise wiring, we all got to work on getting the supports and subroadbed installed into place.  The area formerly planned to be occupied by track will now likely be a whole ton of trees and perhaps a trail of some sort.  We’ll see.

Also of note is the installation of the subroadbed and cork for Bryn.  That’s all done now too.

Cheers!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.