11/11/11
Had to work today, so not as much progress as I was hoping. However, I did manage to spike down a section of the Victoria Sub immediately after the junction switch, and then pulled the fitted track up so I could prep the turnouts (ie: remove the throwbar and headblocks from the wrong side of the switch) and drill the holes for the throwbar as well as drilling a hole in the throwbar for the eventual installation of the Bullfrog.
I also soldered up the turnout for Buckley Bay.
Cheers!
Jon