January 13, 2011
Over the past week, spent time downstairs finishing up the wiring to the track laid.
So to date, all the bullfrogs are wired, the track has been wired.
Next up will be the helix up to the upper deck and to Arrowsmith siding and the grade down to Port Alberni!
Leave a Reply